Legal requirements for updating sppp

29-Jul-2014 22:52 by 9 Comments

Legal requirements for updating sppp - dating and luann de lesseps

Engineering / Civil Managed and performed civil design for TND mixed use development comprised of approximately 34 acres.

legal requirements for updating sppp-49legal requirements for updating sppp-30

Environmental Consulting LL&J manages the Public Schools of Robeson County’s environmental compliancy issues, in addition to other aspects of their infrastructure needs.

Engineering / Civil Member of the design team for a 130,000 square foot senior assisted living community, offering assisted living apartments, memory care and skilled nursing services, as well as a 25,000 square-foot community clubhouse and wellness center for the residents.

A hybrid prototype senior wellness and healthcare facility.

The project included a propeller upgrade to the existing downstream offsite pumpstation and widening of the NCDOT roadway to accommodate a dedicated right turn lane at the main entrance.

Storm water treatment facility was designed as two separate dry detention ponds partly series.

Engineering / Civil Managed and performed civil design for Mixed Used Development (MUD) encompassing approximately 25 acres.

The project consisted of a 3.6 acre Office/Retail parcel the full length of the road frontage; 72 single family lots were tucked behind the commercial parcel and buffered with a 40 foot wide Pedestrian Park.After testing is conducted, LL&J reports the findings in a written report and gives recommendations for abatement and/or no further action.Professional Services LL&J will managed the efforts of its project team members and subcontractors, assign manpower, delegate responsibilities, review work progress, monitor budget and schedule, and otherwise direct the progress of the work to remove three underground fuel tanks including: determining whether the three fuel oil tanks contained any fuel requiring removal, overseeing removal and disposing of the tanks in accordance with NCDENR and NCDOT requirements.Engineering / Civil LL&J designed Civil and Site Layout for the International House of Pancakes located in Lumberton NC.LL&J responsibilities included design, oversight, permitting, and project management.Environmental Due Diligence Lumbee Bank engages LL&J to conduct Phase I Environmental Site Assessments (ESAs) of residential and commercial properties.